Planning
Leaking Vehicles in a Tow Yard: A Staging Checklist
Choose a controlled location, protect drainage, inspect containment, and preserve the handoff record.
Choose a staging area that staff can inspect, protect and hand over between shifts. Keep the containment record with the vehicle.

Prepare the location
Check drainage, surface condition, access, lighting and room for the next movement. Plan for rain, snow and traffic so a parked vehicle does not create an unnoticed fluid path.
Inspect on arrival
Record the known leak, existing controls, mat orientation and attachment. Reassess after transport rather than assuming the roadside setup still fits. Assign the next inspection from the actual conditions.
Hand over or release the vehicle
Record changes after repairs or movement. Before the vehicle leaves, inspect the setup and prepare the next surface. Pass the remaining concern and next action to the receiving person.
Use on the job
Yard shift-handoff card
Frequently asked questions
Questions this guide answers
Where should a leaking vehicle be stored in a tow yard?
Use a controlled area with a known drainage path, safe access, lighting, inspection ownership, weather planning, and room for the next vehicle movement.
How often should a stored leaking vehicle be checked?
Set the interval from the observed leak rate, product loading, weather, and planned work. Record the time and the person responsible for the next check.
Can Spill Diaper stay attached in outdoor storage?
It can provide temporary attached containment when orientation, safe attachment, weather, capacity, and inspection are addressed in the yard procedure.